KNYSNA NEWS - From potholes and faded road markings to blocked stormwater drains, a municipal maintenance programme will soon target problem spots across the greater Knysna between now and December.
For motorists who have become experts at dodging potholes, there may be some welcome relief on the way. Knysna Municipality has announced a road and infrastructure maintenance programme covering several wards, and including repairs to potholes, gravel roads, manholes, pipes and paving, as well as improvements to road markings.
The programme, which runs from November to December, will focus on roads and areas identified by municipal field teams during site inspections.
Acting Municipal Manager Dr Richard Martin said the initial focus would be on key tourist routes, followed by main routes in other suburbs. Some maintenance work is already under way and is expected to be completed soon.
“The Roads Maintenance and Stormwater Action Plan is a targeted maintenance programme across several wards for November and December,” Martin said.
The municipality has released the following schedule of planned work:
Pothole repairs
Repairs are planned for the following roads:
- Ward 2: Lower Service Road, Kingfisher Drive, Main Road and Makou Street (2 to 20 November); Flamingo Avenue (30 November to 4 December); and Swallow Drive and Begonia Street (14 to 18 December).
- Ward 1: Dr Malan Street and Pelican Lane (23 November to 4 December); Oestervanger and Luthango streets (7 to 11 December).
- Ward 9: George Rex Drive, Oupad, Benn Street and Coney Glen Road (2 to 13 November); Wilson Street and Duthie Drive (7 to 11 December).
- Ward 10: Yacht Club Road and Remembrance Avenue (16 to 27 November); Simola and Welbedacht (14 to 18 December).
- Wards 4, 7 and 8: Concordia Road (30 November to 4 December).
- Ward 6: Sunridge, Davidson and Stroebel streets (9 to 20 November).• Wards 6 and 9: Vigilance Drive (9 to 20 November).
- Ward 11: Davidson, Calendar and Fredericks streets (23 November to 4 December); Olifant, Dassie and Taloesie streets (7 to 18 December).
Road markings and gravel roads
Road marking improvements are planned for Knysna Main Street in Ward 10 from 2 November to 11 December, and the Sedgefield Southern Service Road in Ward 2 from 14 to 22 December.
Gravel road maintenance is in Ward 1 on De La Rey, Charles-te-Water, Van Niekerk, Professor, Neddicky, Kalossie, Kort and Melkhout streets, as well as Crane Walk, from 9 November to 22 December.
Stormwater, manholes and other repairs
Stormwater maintenance will be carried out on an ad hoc basis, with municipal teams responding to blockages reported during rainfall events. No specific roads or dates have been listed for this work.
Manhole repairs are scheduled for Wing Street in Ward 5 from 2 to 20 November, and Gray and Queen streets in Ward 10 from 30 November to 18 December.
Pipe repairs are planned for Montagu Street in Ward 10 from 2 to 6 November.
Paving repairs will take place in Boswerker Street in Ward 9 from 9 to 13 November, Main Street in Ward 10 from 16 to 20 November, George Rex Drive in Ward 9 from 23 to 27 November, and the Boardwalk in Ward 10 from 30 November to 4 December.
Residents who need to report genuine emergencies requiring immediate attention can contact the municipality’s 24-hour emergency number on 044 302 8911.