- One of these is avoiding surveying during the peak squid spawning periods between early September and late December, if possible.
- Another mitigation measure is that the surveying should also not be done during the pre-moult and post-moult period for African penguins, from October to March.
- It was also suggested that surveying should not be done during cetacean migration from June to December, to minimise the risk of injury and disturbance to marine mammals. Another key period to avoid surveying includes June to January during peak fish spawning.